Storage tank repair plans the repair contractor can run with.
A solid, code compliant repair plan handed straight to the repair organization, with the requirements and QA/QC steps spelled out. No guesswork.
When the inspection finds a problem.
When inspections or failures reveal a problem, tank owners need the work done quickly, safely and on budget. We help make sense of the inspection report, define the scope of repairs and plan how to complete them.
Our engineers have experience in the design, fabrication, operation and inspection of aboveground storage tanks. That perspective lets them give common sense advice that saves you direct and indirect repair costs.
Our knowledge of API 653 and STI SP001 lets us advise on decisions that affect inspection requirements, and our planning keeps downtime short and the repair schedule efficient.
Inspection methods on repairs
Tank repair services.
- Repair scope evaluation
- Repair plan development
- API 653 and STI SP001 compliance advice
- Cost and schedule planning
- Document review
- Quality assurance (QA) inspection
- Quality control (QC) inspection
- Visual inspection (VT)
- Dye penetrant testing (PT)
- Magnetic particle testing (MT)
- Phased array ultrasonic testing (PAUT)
- Shear wave ultrasonic testing (UTSW)
- Radiography (RT)
From the first call to a report you can file.
Send the equipment list
Tanks, vessels, piping circuits, whatever is coming due. Nameplate photos and past reports help if you have them.
We confirm code and scope
An API certified inspector sorts out which code governs each item, the intervals and the NDE methods that fit the damage you are watching for.
Inspection on site
We schedule around operations or your turnaround. Screening methods and intelligent access cut down on craft support.
Findings and next dates
You get the findings, thickness data and recommended next inspection dates, ready for your MI program.
Common questions.
Do you do the repair work yourselves?
We develop the repair plan and handle QA/QC inspection. The plan is written to be handed directly to the repair organization for planning, review and execution.
Which codes do repair plans follow?
API 653 for field-erected tanks and STI SP001 for shop-fabricated and smaller tanks.